News of Bahrain
Bahrain2 July 20251 min read

Traffic diversions for Busaiteen flyover project

The Ministry of Works, in coordination with the General Directorate of Traffic at the Ministry of Interior, has announced the start of the second and third phases of traffic diversions as part of preparatory works for the construction of

Editorial Team Legacy

Published 2 July 2025, 8:00 · Updated 18:15

Link copied
Traffic diversions for Busaiteen flyover project

TDT | Manama

Email: mail@newsofbahrain.com

The Ministry of Works, in coordination with the General Directorate of Traffic at the Ministry of Interior, has announced the start of the second and third phases of traffic diversions as part of preparatory works for the construction of a new flyover linking the Shaikh Isa bin Salman Causeway to Avenue 105 in the Busaiteen area.

Phase 2 will commence at dawn today, and will involve diverting traffic from Muharraq towards Manama to alternative routes along the Sheikh Isa bin Salman Causeway.

Phase 3 will begin at dawn on Monday, July 7, 2025, redirecting traffic from Manama towards Muharraq to designated alternative routes on the same bridge.

The Ministry urged all road users to adhere to traffic regulations and follow posted signs to ensure safety and reduce congestion during the diversion period.

Join the conversation

Sign in to leave a comment. Every comment is reviewed before it goes live.

No comments yet. Start the conversation.