News of Bahrain
Bahrain3 June 20251 min read

Sewer network project completed in Barbar

A new sewer network has been completed in Block 522 of Barbar, connecting 169 properties, the Works Ministry has announced. The project, located in the Northern Governorate, saw the installation of 3,359 metres of main pipelines and a fu

Editorial Team Legacy

Published 3 June 2025, 8:00 · Updated 18:13

Link copied
Sewer network project completed in Barbar

TDT | Manama

Email: mail@newsofbahrain.com

A new sewer network has been completed in Block 522 of Barbar, connecting 169 properties, the Works Ministry has announced.

The project, located in the Northern Governorate, saw the installation of 3,359 metres of main pipelines and a further 1,561 metres of smaller connecting lines.

A total of 112 main inspection chambers and 160 secondary ones were built.

Fathi Abdulla, Assistant Undersecretary for Sanitary Engineering, said the project is part of the Ministry’s effort to expand coverage as residential areas grow.

He added that the Ministry is working to match the pace of urban spread by putting in place basic groundwork where it is needed.

The Ministry thanked residents for their cooperation and for following the safety measures during the construction Newly paved road after completion of sewer infrastructure project period.

Join the conversation

Sign in to leave a comment. Every comment is reviewed before it goes live.

No comments yet. Start the conversation.