BD7.5m Phase Complete
Ministry of Works completed the first phase of infrastructure works in Wadi Al Buhair at a cost of BD7.5 million, covering road levelling and rainwater drainage linked to Tubli Bay. Two more phases are in progress: the second is set to g
