News of Bahrain
Bahrain6 June 20231 min read

Works Ministry steps up infrastructure project

TDT | Manama The Daily Tribune – www.newsofbahrain.com Work on the sanitary drainage project in bloc 733 in the Capital Governorate is on track as planned. Works Ministry Assistant Undersecretary for sewage projects Fathi Abdulla Al Farea inspected the project, as part of a

Editorial Team Legacy

Published 6 June 2023, 8:00 · Updated 22:11

Link copied
Works Ministry steps up infrastructure project

TDT | Manama

The Daily Tribune – www.newsofbahrain.com

Work on the sanitary drainage project in bloc 733 in the Capital Governorate is on track as planned. Works Ministry Assistant Undersecretary for sewage projects Fathi Abdulla Al Farea inspected the project, as part of a strategy to expand drainage networks across the Kingdom of Bahrain.

The Tender Board had awarded the urban infrastructure project to Al Naseef Construction Company under a contract for BD260,000. Al Farea stressed the importance of optimizing the use of treated water by expanding pumping, transporting and distributing services.

He stressed the ministry’s continuous efforts to benefit from triple-treated sewage water to irrigate crops in streets and parks, in addition to supplying farms with treated water.

Join the conversation

Sign in to leave a comment. Every comment is reviewed before it goes live.

No comments yet. Start the conversation.