What does an EWA connection actually cost for a new-build villa in Saar?

Mariam Janahi

طُرح قبل أسبوعين · سؤال واحد

The developer quoted a figure that seems to bundle the deposit, the meter and the internal inspection together, and I can't tell which parts are EWA's official fees and which are the contractor's margin. Has anyone itemised this recently?
7
أبرز إجابةMost upvoted of 2
Ask for the EWA receipt separately. The deposit is fixed by tariff band and the meter installation has a published rate, so anything above those two lines is the contractor's. I paid mine in March and the split was clear once I asked in writing.
Noora Alkhalifa

إجابة واحدة · قبل أسبوعين

5

إجابة إضافية واحدة

0أصوات
Priya Menon

إجابة واحدة · قبل أسبوعين

Same experience in Budaiya last year. Get the EWA fee schedule PDF and highlight the lines before you sign the contractor variation.

أضف إجابتك

أجب من تجربتك حيث يمكنك. التفاصيل تفيد أكثر من النصائح العامة.

2 answers · What does an EWA connection actually cost for a…

أضف إجابتك